Row 50 Neighborhood Road Paving (2026)
location_onROW 50 Development Corridor Bintaro Jaya

Row 50 Neighborhood Road Paving
ROW 50 Development Corridor Bintaro Jaya
Bintaro Jaya
Hotmix Asphalt Binder & Wearing Course
± 5,800 m²
9 Calendar Days
About the Project
Two-layer paving (5cm AC-BC and 4cm AC-WC) engineered to withstand expanding commuter and service vehicle volumes.
Committed to genuine AMP material quality and veteran workmanship, PT Rizal Jaya Construction ensures every inch of pavement achieves uniform density, wave-free smoothness, and optimal rainwater runoff.
Precision mechanical compaction using tandem rollers ensures asphalt does not easily sag or form hairline cracks.
Road edges are calibrated precisely along curbs and culverts to prevent rainwater accumulation.
Technical Specifications & Machinery
layersMain Materials Used
- check_circleHotmix AC-BC & AC-WC
- check_circlePrime Coat MC-30
- check_circleCationic Tack Coat
precision_manufacturingHeavy Machinery Deployed
- buildWide-Screed Asphalt Finisher
- build8-Ton Tandem Roller
- buildPneumatic Tire Roller
fact_checkQuality Control Standards
- verified_userBina Marga Arterial Standards
- verified_userCore Drill Verified Density
Structural Road Pavement Warranty
Documentation Gallery
Visual documentation of paving stages from site preparation to final compaction.

Site Preparation & Road Cleaning
Clearing dust, moss, and loose soil using high-pressure air compressors to ensure maximum asphalt adhesion.

Tack Coat Emulsion Spraying
Evenly spraying cationic asphalt tack coat across the subgrade before hotmix asphalt application.

Precision AC-WC Hotmix Laying
Spreading hotmix asphalt at optimal temperatures (110°-150°C) to maintain density and structural flexibility.

Tandem Roller Compaction on Residential Lanes
Repeated mechanical rolling with 4-6 ton Tandem Rollers for a dense, sturdy, and watertight pavement.

Edge Profiling & Drainage Alignment
Calibrating road edge elevations against curbs and gutters to ensure rainwater drains smoothly without puddles.

Finished Smooth Asphalt Pavement
Level, durable, and clean hotmix asphalt roadway open to residential traffic with guaranteed durability.
Related Projects & Works

Cluster Kucica Residential Paving
Neighborhood road rejuvenation in Cluster Kucica Bintaro Jaya was executed as a strategic enhancement of mobility and aesthetic value for an exclusive residential estate.

Cluster Cikini 3 Residential Paving
Enhancing internal residential road quality in Cluster Cikini 3 for smooth and safe daily vehicle mobility.

Sector 3 Main Road Paving
Reconstruction and asphalt overlay on Sector 3 arterial corridors to ensure smooth flow for heavy daily commuter traffic.
Need Similar Asphalt Paving Work?
Consult your hotmix paving or infrastructure project needs with PT Rizal Jaya Construction. Free site survey & transparent cost estimate.