Logo PT Rizal Jaya Construction
Residential PavingStatus: Completed on Schedule

Cluster Cikini 3 Residential Paving (2025)

Cluster Cikini 3, Bintaro Jaya Sector 7, South Tangerang

Cluster Cikini 3 Residential Paving
Final Field Documentation

Cluster Cikini 3 Residential Paving

Project Location

Cluster Cikini 3, Bintaro Jaya Sector 7, South Tangerang

Client / Developer

Bintaro Jaya

Material Type

Hotmix Asphalt AC-WC & AC-BC

Estimated Area

± 3,800 m²

Execution Duration

6 Calendar Days

Scope of Work

About the Project

Enhancing internal residential road quality in Cluster Cikini 3 for smooth and safe daily vehicle mobility.

Work focused on subgrade re-leveling, uniform tack coat application, and precision tandem roller compaction, yielding a dense, watertight, and durable asphalt surface.

Committed to genuine AMP material quality and veteran workmanship, PT Rizal Jaya Construction ensures every inch of pavement achieves uniform density, wave-free smoothness, and optimal rainwater runoff.

Prime Compaction Control

Precision mechanical compaction using tandem rollers ensures asphalt does not easily sag or form hairline cracks.

Elevation & Water Runoff

Road edges are calibrated precisely along curbs and culverts to prevent rainwater accumulation.

SPECIFICATION DATA

Technical Specifications & Machinery

Main Materials Used

  • Hotmix Asphalt AC-WC
  • Cationic Tack Coat Emulsion

Heavy Machinery Deployed

  • 4-Ton Tandem Roller
  • Baby Roller
  • Asphalt Sprayer

Quality Control Standards

  • Bina Marga Technical Standards
  • Placement Temperature 120u00b0C - 150u00b0C
Quality Warranty & Guarantee

Official Maintenance Warranty

Similar References

Related Projects & Works

View All Projects
Cluster Kucica Residential Paving
Bintaro Jaya

Cluster Kucica Residential Paving

Neighborhood road rejuvenation in Cluster Kucica Bintaro Jaya was executed as a strategic enhancement of mobility and aesthetic value for an exclusive residential estate.

View project details→
Sector 3 Main Road Paving
Bintaro Jaya

Sector 3 Main Road Paving

Reconstruction and asphalt overlay on Sector 3 arterial corridors to ensure smooth flow for heavy daily commuter traffic.

View project details→
Sector 9 Main Road Paving
Bintaro Jaya

Sector 9 Main Road Paving

Asphalt resurfacing across Sector 9 commercial and culinary corridors with high weekend and evening vehicle traffic.

View project details→
FREE TECHNICAL CONSULTATION & SITE SURVEY

Need Similar Asphalt Paving Work?

Consult your hotmix paving or infrastructure project needs with PT Rizal Jaya Construction. Free site survey & transparent cost estimate.