Logo PT Rizal Jaya Construction
Main Roads & ArterialsStatus: Completed on Schedule

Sector 9 Main Road Paving (2025)

Commercial & Arterial Hub Sector 9, Bintaro Jaya

Sector 9 Main Road Paving
Final Field Documentation

Sector 9 Main Road Paving

Project Location

Commercial & Arterial Hub Sector 9, Bintaro Jaya

Client / Developer

Bintaro Jaya

Material Type

Hotmix Asphalt AC-WC Super

Estimated Area

± 5,200 m²

Execution Duration

8 Calendar Days

Scope of Work

About the Project

Asphalt resurfacing across Sector 9 commercial and culinary corridors with high weekend and evening vehicle traffic.

Eliminating old surface cracks and introducing a fresh, skid-resistant asphalt overlay that enhances driving safety in this vibrant commercial district.

Committed to genuine AMP material quality and veteran workmanship, PT Rizal Jaya Construction ensures every inch of pavement achieves uniform density, wave-free smoothness, and optimal rainwater runoff.

Prime Compaction Control

Precision mechanical compaction using tandem rollers ensures asphalt does not easily sag or form hairline cracks.

Elevation & Water Runoff

Road edges are calibrated precisely along curbs and culverts to prevent rainwater accumulation.

SPECIFICATION DATA

Technical Specifications & Machinery

Main Materials Used

  • Hotmix Asphalt AC-WC Fine
  • Rapid-Bonding Tack Coat

Heavy Machinery Deployed

  • Tandem Roller
  • Baby Roller
  • Asphalt Finisher

Quality Control Standards

  • Strict Straight-Edge Tolerances
  • Controlled Compaction Temperatures
Quality Warranty & Guarantee

Quality & Maintenance Warranty

Similar References

Related Projects & Works

View All Projects
Cluster Kucica Residential Paving
Bintaro Jaya

Cluster Kucica Residential Paving

Neighborhood road rejuvenation in Cluster Kucica Bintaro Jaya was executed as a strategic enhancement of mobility and aesthetic value for an exclusive residential estate.

View project details→
Cluster Cikini 3 Residential Paving
Bintaro Jaya

Cluster Cikini 3 Residential Paving

Enhancing internal residential road quality in Cluster Cikini 3 for smooth and safe daily vehicle mobility.

View project details→
Sector 3 Main Road Paving
Bintaro Jaya

Sector 3 Main Road Paving

Reconstruction and asphalt overlay on Sector 3 arterial corridors to ensure smooth flow for heavy daily commuter traffic.

View project details→
FREE TECHNICAL CONSULTATION & SITE SURVEY

Need Similar Asphalt Paving Work?

Consult your hotmix paving or infrastructure project needs with PT Rizal Jaya Construction. Free site survey & transparent cost estimate.