Logo PT Rizal Jaya Construction
Neighborhood RoadsStatus: Completed on Schedule

Row 50 Neighborhood Road Paving (2026)

ROW 50 Development Corridor Bintaro Jaya

Row 50 Neighborhood Road Paving
Final Field Documentation

Row 50 Neighborhood Road Paving

Project Location

ROW 50 Development Corridor Bintaro Jaya

Client / Developer

Bintaro Jaya

Material Type

Hotmix Asphalt Binder & Wearing Course

Estimated Area

± 5,800 m²

Execution Duration

9 Calendar Days

Scope of Work

About the Project

New boulevard construction across wide 50-meter right-of-way zones connecting residential enclaves to regional arteries.

Two-layer paving (5cm AC-BC and 4cm AC-WC) engineered to withstand expanding commuter and service vehicle volumes.

Committed to genuine AMP material quality and veteran workmanship, PT Rizal Jaya Construction ensures every inch of pavement achieves uniform density, wave-free smoothness, and optimal rainwater runoff.

Prime Compaction Control

Precision mechanical compaction using tandem rollers ensures asphalt does not easily sag or form hairline cracks.

Elevation & Water Runoff

Road edges are calibrated precisely along curbs and culverts to prevent rainwater accumulation.

SPECIFICATION DATA

Technical Specifications & Machinery

Main Materials Used

  • Hotmix AC-BC & AC-WC
  • Prime Coat MC-30
  • Cationic Tack Coat

Heavy Machinery Deployed

  • Wide-Screed Asphalt Finisher
  • 8-Ton Tandem Roller
  • Pneumatic Tire Roller

Quality Control Standards

  • Bina Marga Arterial Standards
  • Core Drill Verified Density
Quality Warranty & Guarantee

Structural Road Pavement Warranty

Similar References

Related Projects & Works

View All Projects
Cluster Kucica Residential Paving
Bintaro Jaya

Cluster Kucica Residential Paving

Neighborhood road rejuvenation in Cluster Kucica Bintaro Jaya was executed as a strategic enhancement of mobility and aesthetic value for an exclusive residential estate.

View project details→
Cluster Cikini 3 Residential Paving
Bintaro Jaya

Cluster Cikini 3 Residential Paving

Enhancing internal residential road quality in Cluster Cikini 3 for smooth and safe daily vehicle mobility.

View project details→
Sector 3 Main Road Paving
Bintaro Jaya

Sector 3 Main Road Paving

Reconstruction and asphalt overlay on Sector 3 arterial corridors to ensure smooth flow for heavy daily commuter traffic.

View project details→
FREE TECHNICAL CONSULTATION & SITE SURVEY

Need Similar Asphalt Paving Work?

Consult your hotmix paving or infrastructure project needs with PT Rizal Jaya Construction. Free site survey & transparent cost estimate.